A summary list of the main works:
- Italy Structural design at a definitive and executive level of interventions for seismic adaptation of 6 viaducts of the A24 Teramo L'Aquila (Client: Strada Dei Parchi) - 2018-2019.
- Italy Independent validation service of structural calculations, according to the NTC2018, of the detailed design of the Polcevera viaduct of Genoa (Client: Italferr) - 2019.
- Italy Preliminary and detailed design of the new cable-stayed pedestrian bridge on the river Alento (CH) (Client: Comune di Francavilla al Mare) - 2019.
- Italy Specialist support services for the preliminary and detailed design of seismic adaptation interventions on some A25 viaducts (Client: Infraengineering) - 2018-2019.
- Italy Detailed design of the interventions for adjustment and urgent safety measures (MISU) of the A24 and A25 motorways (Client: Strada dei Parchi) - 2017-2018.
- India Detailed design and construction supervision of the new railway bridge named Anjj Khad in the Kashmir region in northern India (Client: Italferr) - 2016 in progress.
- Italy Motorways A24 Rome-Torano and A25 Torano-Pescara assignment for the update od the viaducts' seismic vulnerability (Client: Strada dei Parchi) - 2015.
- Dominican Republic - Design verification and control service for the cable-stayed bridge over the Rio Ozama of the Santo Domingo metro line (Client: Technital SpA) - 2014-2015.
- Italy In progress and final static testing of “Piazza della Libertà" (Client: Municipality of Salerno) - 2013-2019.
- Italy Preliminary and detailed design, supervision of works, coordination of safety in the planning phase and in the execution phase of the intervention of "Rione Petrosino road connection - via Fratelli Magnone" (Client: Municipality of Salerno) -2012.
- Italy Detailed design and design for construction of the new bridge over the river Ticino in the Municipality of Vigevano (Client: COOP CESI - Pavia) 2011-2012.
- Italy Static testing of Highway A9 Lainate-Como-Chiasso - section: interconnection of Lainate - Como (Grandate) Viaduct 1 (Client: Autostrade per l'Italia) - 2011-2013.
- Italy Static testing A14 Bologna -Bari-Taranto - Section Rimini North - Cattolica-Job order N. Og271 - Oda N. 5164154 - (Client: Autostrade per l'Italia) - 2011-2013.
- Italy Commission for the preparation of seismic vulnerability studies of about 175 viaducts included in the entire motorway section of the A24 and A25, in accordance with the NTC2008 and the OPCM ordinance 3274/03 (Client: INFRAENGENNERING) - 2011-2012.
- Italy N.3 Viaducts of the SS7 Appia in Ariccia: Pio IX Monumental Bridge, Borgo S. Rocco Bridge and Galloro Bridge - assessment of vulnerability and seismic risk (Client: Municipality of Ariccia) - 2010-2011.
- Italy Preliminary design for the restoration of a rail connection between the port of Civitavecchia and the Priority Axis TEN-T N. 1 and the town of Orte (including some large span bridges and viaducts, of masonry and steel, subjected to constraints by the Archaeological Heritage of Southern Tuscia (Client: Italferr SpA) - 2010-2011.
- Italy Preliminary design of the Fondi-Ceprano connection in variant to the SS.82 Valle del Liri and SS 673 of Frosinone and Gaeta (Client: Regione Lazio) - 2010.
- Italy Preliminary design Road axis parallel to via del Casale di San Basilio OP2 Urban Planning Convention of 12/30/2009 - PRU San Basilio ex art.11 L.493 / 93 - Proposal 16 (Client: Consorzio S. Basilio) 2010-2012.
- Serbia Team Leader of the ITALFERR-IRD group charged by European Agency for the design of the Reconstruction of the new bridge over the Danube in Novi Sad in place of the one bombed in 1999 (2007-2009).
- Italy Detailed design of the structural consolidation of the Serra Moresca and the annexed Tower as part of the renovation works Villa Torlonia in Rome - L. 396/90 cod.b.3 (Client IAB SpA) - 2008.
- Italy Team Leader of the group charged by the Municipality of Rome for the detailed design and design for construction of the “New Bridge of Musica” on the Tiber in Rome (2007-2009).
- Italy Static testing Pian di Setta Viaduct A1 Milan-Naples Motorway Section: La Quercia / Lagaro - Lot 5 ° (Client: Autostrade per l'Italia) 2009-2014.
- Italy Assignment of the company Met.Ro for the detaield design of the adaptation and consolidation of the bridges over the Tiber and the Tor di Quinto ditch of the Rome-Viterbo railway line (2007-2008).
- Jordan Design, on behalf of C. Lotti e Associati, of the viaducts of the new Amman bypass (2006-2008).
- Italy Static testing of the Empire Viaduct Doubling of the railway line On the S. Lorenzo al Mare –Andora section - Genoa Route - Ventimiglia - (Client: Italferr SpA) - 2007-2018.
- Italy Preliminary, detailed and construction design of the completion of the Rome - L'Aquila - Teramo motorway itinerary. A24 L'Aquila - Teramo, section of Villa Vomano. The project includes, for the new East carriageway heading towards Teramo, the S. Antonio and Vomano viaducts. The design of the Carestia tunnel of about 800 m of length and numerous defense works with anchored bulkheads of over 10 m of height are also included (Client: Toto SpA) - 2004-2008.
- Italy High-Speed Bologna - Milan - Detailed design and design for construction of the bridge over the river Po. The work includes the access viaducts, of embankments and the large span cable stayed bridge on the river Po; with its 200 m of the main span, it is the longest bridge built on the new lines for the High Speed Railway (Client: Cepav Uno - San Donato Milanese) - 1998-2006.
- Italy SS 675 - Umbro-Laziale Viterbo - Orte - Detailed design for integrated tender of the SS 675 Tronco 3 ° Lot 1 ° from the junction for the SP Vetralla - Tuscania, and the junction with the SS1 Aurelia bis (Client: ANAS) - 2004-2006.
- Italy Junction Via Tintoretto - V. Laurentina - V. delle Tre Fontane Rome - Italy. Detailed design of the Via del Tintoretto-Via Laurentina junction - Via delle Tre Fontane. The work includes the Tintoretto overpass made of a steel-concrete continuous beam on two spans with a total length of 52 m, a 16x8.80 m box-shaped artifact under the Via Laurentina with a total length of 45 m, bulkheads with ø1200 piles and auxiliary works such as retaining walls and pedestrian walkways (Client: I.SV.E. UR. SpA).
- Italy Institute for Building and Urban Development (2002-2003) A3 Salerno - R.Calabria Viaduct Sfalassà - Detailed design and environmental impact study from Km 414 + 490 to Km 417 + 150. The work, among the most important ones of the entire Italian motorway network, consists of a long steel span of 376.0 m plus four access viaducts in a mixed steel-concrete structure, two tunnels and other minor viaducts (Client: ANAS General Management) - 1999-2003.
- Italy Construction supervision and assistance to the testing for a pedestrian connection between Piazzale Marconi and Via Gavazzeni as part of the redevelopment of the Bergamo railway station - 1st Functional Lot (Client: Municipality of Bergamo) - 2005-2009
- Italy A3 Salerno - Reggio Calabria, Viadotto Fuorni - Detailed design of the bridge over the Fuorni torrent, with a main span of length 110 m, as part of the modernization of the A3 trunk 1, section 1, lot 2 (Client: Toto SpA) - 2003-2006.
- Italy A3 Salerno - Reggio Calabria - Detailed and construction design of the Highway A3 Salerno-Reggio Calabria Section 3 Section 2 Lot 1 from Km 348 + 600 to Km 359 + 400. The assignment concerned the detailed design and design for construction of 12 viaducts of mixed steel structure built on-site by demolishing the prc decks and reusing the existing piers (Client: Toto SpA Chieti) - 2001-2003.
- Italy Restoration, consolidation and functional recovery of the Casino Nobile of Villa Torlonia - Rome; consulting in the stability analysis of the rib vault of the Sala di Bacco, of the rib vault of the Ballroom and design of the necessary reinforcement and consolidation interventions (Client: IAB SpA) - 2005
- Italy Preliminary and detailed design and safety coordination for the construction of a pedestrian connection between Piazzale Marconi and Via Gavazzeni as part of the redevelopment of the Bergamo railway station (Client: Municipality of Bergamo) - 2002-2003.
- Italy SS 16 "Adriatica" - Detailed and design for construction of the external variant to the towns of Montesilvano and Marina Città S. Angelo - Lot 1 - including the Mazzocco arch bridge with a 70 m span consisting of 5 ribs, each of which is made by launching three precast segments solizarized in situ (Client: A & I. Della Morte SpA) - (2001-2002.
- Italy Detailed design of the Bologna-Verona railway doubling line S. Felice sul Panaro-Poggio Rusco section From Km 45 + 000 to Km 58 + 800: detailed design of the foundation and substructures belonging to the Panaro and Tramuschio Viaducts for a total development of approximately 8.0km (Client: Italferr Spa) - 2001-2004.
- Italy Urban Penetration AV Bologna Node Support to the detailed design lot Km 3 + 906 and Km 3 + 912. The work includes the overpass of the A14 and the bypass with a through steel truss railway deck of 76 m of length, the two access spans of about 30 m and the substructures all on piles. Given the singularity of the work, the design includes, among other things, the train-rail-structure interaction and runability analysis (Client: Italferr Spa) - 2002-2003.
- Italy Detailed design of the Rome GRA motorway, north-west quadrant lot 6 from Km 17 + 400 to Km 18 + 800 (Flaminia-bridge over the Tiber junction)- (Client: ANAS General Management) - 2000.
- ItalyPreliminary design of the Road Sea-Monti Amantea-Cosenza (Client: Municipality of Amantea (CS)) - 2000.
- Italy Railway and road viaduct on the Empire torrent doubling of the Genoa line Ventimiglia - conceptual and preliminary design of the structures of the railway viaduct and of the road viaduct, roofing, canopies and hydraulics of the Impero Torrent, of the Rio Oliveto and of the railway site between Gorleri and Bardellini (Client: Italferr Spa) - 2000-2001.
- Italy Testing of the works of art of the construction works of lot n. 2 Section T4 Road to SV from the S. Lucia junction to the Spianà Zone junction (Client: ANAS Comp.Viab. Veneto) - 2000.
- Italy Static testing Padulicella Viaduct TO-NA AV Line - Rome-Naples section WBS - V193 (Client: TAV - High Speed Train) - 1999-2006.
- Italy Preliminary and detailed design of the SS 675 Umbro-Laziale (Viterbo-Orte) Section 3 Lot 1 (Client: ANAS Comp.Viab. Lazio) - 1999.
- Italy A1 Milan - Naples Detailed design viaduct over the river Reno along the Sasso Marconi- La Quercia junction of the Highway A1 var (Client: Spea- Ingegneria Europea SpA) - 1998.
- Libano Beirut - Detailed design and design for construction of the Hadat Frontier Syrian Highway, Saoufar-Mdeirej sector, including 2 viaducts of 40-m spans and piles of variable heights up to over 60 m with continuous beam deck in precast concrete solidarired in place (Client: Toto SpA) - 1998-1999.
- Italy Design of the works of art of Lot 3 from Futani to Centola airport SS 18 of Cilento (Client: Studio Lotti) - 1997.
- Italy Preliminary and detailed design and environmental impact study in the Sfercia-Colle Sentino II section - SS 77 "Val di Chienti" (Client: Province of Macerata) - 1997.
- Italy Preliminary design and environmental integration study of the SS 148 Pontina from Km 60 + 00 and 109 + 00 (Client: ANAS Comp .Viab. Lazio) (1996-1998).
- Algeria Detailed design of cable-stayed bridge consolidation CID M'CID - FREYSSINET - 1998.
- Italy Motorway Turin-Savona Design of Viaduct Stura di Demonte construction II carriageway , total length L = 2750 (Client: Toto Spa) - 1996.
- Libya Supervision to the extraordinary maintenance works of the Wadi Kuf Bridge, the main span of which is 282 m long (Client: Delma SpA) - 1996-2000.
- Italy Motorway Torino-Savona Design n ° 7 viaducts for the doubling of the section between Fossano-Priero L = 1950 (Client: Toto Spa) - 1995-1996.
- Italy General planning Study of traffic and parking areas for the transport hub - Terracina (Client: Municipality of Terracina) - 1995.
- Italy Verifications of the "Ponte della Becca" structures on the PO - SS 617 - Non-destructive tests and numerical analysis (Client: I. Geosonda) - 1995.
- Italy Motorway Venice-Trieste Design of 2 Viaducts on the Torre and Isonzo torrents, total length L = 1450 m (Client: Toto Spa) - 1995.
- Algeria Constantine Preliminary, detailed design and design for construction of the cable-stayed bridge on the Oued Dib made of prc with main span of length of 280 m located in a highly seismic area (Client: GI.CO. Built. SpA) - 1993-1995.
- Italy Control of the structures of the sport building "Palazzo dello Sport PALAEUR" in Rome (Client: Ente Eur and Comune di RM) - 1993
- Italy Preliminary and detailed design of the “Stazione-Mare” road Terracina New urban road Station-Sea (Client: Municipality of Terracina) - 1992-1993.
- Italy Conceptual design City-Hospital connection road (Client: Impresa Falcione Campobasso) - 1991.
- Italy Preliminary design and Environmental Impact Assessment of the connection between Terracina and Formia Km 34 + 300 (In group - 35% group leader) (Client: Lazio Region)- 1990-1991.
- Italy Preliminary and detailed design and design for construction of the railway viaducts of the Rome Florence line Arezzo-Valdarno section (Client: FESPI Consortium - Rome) - 1986-1989.
- Italy SS 17 "Appulo Sannitica" Variant from Km 273 + 400 to Km 284 + 300 (Client: Toto SpA Chieti) - 1985.
- Philippines Preliminary and detailed design Fly-Over for access to the new airport (Client: Sauti on behalf of she ADB) - 1984.
- Italy Detailed design SS 16 "Adriatica" Variante di Pescara and Svincolo S. Silvestro (Client: Toto SpA Chieti) - 1982.
- Italy Consolidation of the school building “F. Aporti" for the doubling of the Fleming Gallery on the Via Olimpica in Rome (Client: Cons: Italstrade SpA-Ferrofir Federici SpA-Ietto SpA.) - 1987-1988.
- Italy Consolidation and expansion of the masonry arches bridge, of the SS 145 “Sorrentina” on the Seiano Valley (Client: I. CO: GE: CO) - 1977-1978
- Saudi Arabia Preliminary preliminary and detailed design, design for construction of Ring-Rod - Viaducts of the New Airport and Daharan junctions (Client: SAUTI on behalf of the Ministry of Municipal Affairs) - 1977-1982.
- Saudi Arabia Preliminary and detailed design of the Viaducts for the release of the Ministry of Commerce (Client: SAUTI on behalf of the Ministry of Municipal Affairs) - 1975-77.
- Yugoslavia Preliminary and detailed design of n. 65 Viaducts for a total length L = 15918 m (Client: Consult projects on behalf of the Yugoslav Government) - 1970-72.
- Argentina Detailed design of the bridge viaducts for the access to the Paranà Bridge (Client: Chaco - Corrientes - Amman & Whitney) - 1968-73.
- Italy Detailed design of the 34th lot Km 3 + 030 Highway Palermo - Catania - (Client: ANAS - Rome.) - 1969.
- Italy Preliminary design of the entire Valle Sinni road Km 80 + 600 (Client: CAS. MEZ.- Rome) - 1968.
- Italy Preliminary and detailed design from Km 58 + 100 to Km 63 + 811 of the urban Highway Grande Raccordo Anulare of Rome (Client: ANAS - Rome) - 1965-67.
- Italy Preliminary and detailed design of the Valle del Noce road 3rd section - a 140-m arch bridge built on a self-supporting steel arch plus various viaducts, total length L = 1200 m (Client: Studio Lotti on behalf of the CAS. MEZ.- Rome) - 1965.